HTS New England equipped the MGH Navy Yard facility with a new chiller for their renovation. Due to the procedures done and sensitive equipment used within the facility, the MGH Navy Yard needed a high quality chiller solution.
HTS provided the hospital with a Daikin Magnetic Bearing Chiller, chosen for the oil free technology. With excellent full load and part load efficiency rating, a small footprint, low operating costs, and minimal maintenance required, the Daikin chiller was the perfect fit. In addition, HTS provided full factory witness testing for the MGH Navy Yard facility at three operating points to ensure the system was functioning properly.