HTS was chosen as the basis of design to provide a direct replacement for the building’s outdated units. Eight Daikin RTUs were installed, and the doors had to be reduced to half their size in order to open in the tight space. The two buildings will now be serviced efficiently and effectively, saving on energy and maintenance costs in the future.