Cy-Fair ISD Hamilton Elementary has over 1,000 students and Thornton Middle School has almost 2,000 students. Both schools were in need of an HVAC renovation and the district turned to DBR Engineering for assistance. HTS worked with the design and construction team to provide a 225 Tons Daikin air cooled chiller and a 3100 cfm Daikin Skyline air handling unit.
Cy-Fair ISD Hamilton & Thornton Additions & Renovations
- Building OwnerCypress-Fairbanks ISD
- MEP EngineerDBR Engineering
- Mechanical ContractorStandard Mechanical
- ArchitectVLK Architects